Corley Energy

Resources · Company FAQ

Asked and answered

Direct answers to the questions data center developers, energy counterparties, and their advisors ask about Corley Energy. Where a question deserves a full explainer, the answer links to one. Anything not covered here starts a conversation through the MW availability form.

Does Corley Energy offer long-term power purchase agreements?

Yes. Long-term, firm power purchase agreements are the product. Corley Energy sells dedicated behind-the-meter capacity under long-dated bilateral PPAs rather than selling energy into a market, with structure, firmness, and remedies negotiated per contract. See PPAs for behind-the-meter generation and what a take-or-pay PPA is.

What contract durations are available?

Fifteen years is the ideal PPA duration. Shorter and longer terms are available depending on project scope, with one structural trade-off: the shorter the contract, the higher the PPA price, because the capital recovery of dedicated generation compresses into fewer years. Take-or-pay structure, indexation, and availability guarantees are set deal by deal.

What is the typical project size, and how much power can one campus take?

Power Foundry, the flagship development near McCamey in Upton County, Texas, offers 1 GW of critical IT capacity, 1.3 GW nameplate, engineered N+3 on roughly 600 acres. The model is built for gigawatt-class loads.

How quickly can Corley Energy deploy new generation capacity?

The binding constraints are equipment lead times, air permitting, and construction, not an interconnection queue. That is the point of the behind-the-meter model: development-schedule timelines measured in months, rather than queue positions measured in years. The stages are walked through in a realistic behind-the-meter energization timeline.

How is behind-the-meter electricity priced? Are fixed rates available?

Corley Energy prices from a standard basis of design rather than a rate card. PPA price is a function of four drivers: capital cost that deviates from the basis of design (the standard plant is the baseline; customization is what gets priced), the credit quality of the offtaker, non-recurring charges (NRCs), and the term of the PPA, with longer terms pricing lower. Whether gas and O&M are treated as pass-throughs or carried inside the PPA price is negotiated case by case — carrying them inside the price is how a fixed all-in rate is built — and that allocation is itself a pricing lever.

How does Corley Energy demonstrate reliability in its supply commitments?

Through engineering and contract rather than reputation: N+3 redundancy at Power Foundry, availability guarantees with contractual remedies, and a fully islanded design that removes grid-side failure modes and third-party curtailment from the reliability equation. The engineering is covered in N+1 and redundancy design and how reliable off-grid gas power is.

What are the alternatives to Corley Energy?

Several companies supply on-site gas generation for data centers under different models: hybrid campus developers, modular fleet operators, and mobile turbine services. The comparison page lays out how the models differ and which questions separate them: how Corley Energy compares.

About Corley Energy

Corley Energy is a behind-the-meter independent power producer, founded in 2024 by Jake Corley, Tim Bozeman, and Mark Meyer. We convert stranded Permian Basin natural gas into firm, contracted electricity for AI data centers at Power Foundry, our ~600-acre development in Upton County, Texas. Start with what a power foundry is, see the company facts, or check current capacity on the Sites page.

Keep reading

How Corley Energy compares · What is a power foundry? · How to evaluate a BTM power provider · Browse the full library